OUTAGE NO. 12093    
  CAMPUS     POSTED: May 3, 2018    
   
REQUESTER NAME   Jay Kurian
DEPARTMENT Proj. Management
 
CONTACT Jay Kurian
CONTACT INFO Preferred contact method: by Phone
Randy Stuckey 310-597-2854; John Foerster 310-863-8942
 
JOB 5029235
 
     
START DATE/TIME
Mon, May 07, 2018 9:00 PM
 
END DATE/TIME
Sat, May 26, 2018 6:00 AM
Completed!
 
     
DESCRIPTION
May 7th through the 25th weeknights from 9:00PM to 6:00AM (Starting 11PM on event nights). Facilities has scheduled partial shutdowns of the Strathmore Place and Westwood Plaza Intersection and The Gateway Plaza Loop. Strathmore Place westbound will intermittently be closed from the intersection. There will be limited traffic able to enter the alley east of the intersection. Crews and equipment will also be working in the alley around Engineering IV. Please be aware that Heavy vehicles & workers will be operating in the area. Electronic lights, signage and flag personnel may also be present to direct traffic as necessary. Please forward this information to all interested parties. Thank you.
 
     
OUTAGE TYPE(S)
Traffic Notice Full Closure  |  Traffic Notice Partial Closure  |  Traffic Notice Walkways - Pathways
 
OUTAGE LOCATION(S)
Boelter Hall  |  California NanoSystems Institute (CNSI)  |  CampusWide Work (Multiple Bldgs)  |  Engineering 5  |  Engineering 6  |  Luskin Center  |  Mathematical Sciences Bldg.  |  Parking Structure 9  |  Strathmore Building
 
MAP LOCATION
LAT 0 • LON 0
 
     
Menu
Back
View Notified List
 
     
LOCATION DETAILS
Strathmore Place and Westwood Plaza Intersection. Alley Between Engineering V, Engineering IV, Engineering V and Boelter Hall.
 
OTHER SERVICES
none
 
COORDINATION DETAILS
The temporary street closure was coordinated by Design & Project Management and Transportation Services

For any inquiries, please contact Trouble Call at 59236.
 
Send email comments to: Outage@facnet.ucla.edu