OUTAGE NO. 12216    
  CAMPUS     POSTED: Jun 29, 2018    
   
REQUESTER NAME   Andrew Ray
DEPARTMENT Elect Infr Str-High Volt
 
CONTACT Andrew Ray
CONTACT INFO Preferred contact method: by Email
(Email: aray@facnet.ucla.edu)
 
JOB 5528480
 
     
START DATE/TIME
Thu, July 12, 2018 6:00 AM
 
END DATE/TIME
Thu, July 12, 2018 7:00 AM
Completed!
 
     
DESCRIPTION
Facilities Management Electrical Shop requests notification to building occupants that they will be testing the emergency generator and automatic transfer switches.
 
     
OUTAGE TYPE(S)
Electrical Generator Power
 
OUTAGE LOCATION(S)
CHS MacDonald Research Lab (MRL)
 
MAP LOCATION
LAT 0 • LON 0
 
     
Menu
Back
View Notified List
 
     
LOCATION DETAILS
The Emergency power to all of these buildings will be affected. This test is the monthly automatic transfer switch test. It will not affect the normal electrical power to the building. However, it will cause a momentary loss of power to equipment fed by Emergency power. This loss of power should be for less than one second. This interruption of power will take place at the start and again at the finish of this test.
 
OTHER SERVICES
none
 
COORDINATION DETAILS
This routine monthly generator test date and time was coordinated between in-house staff and Building Coordinators to minimize the impact on building occupants.

For any inquiries, please contact Trouble Call at 59236.
 
Send email comments to: Outage@facnet.ucla.edu